When a pipeline segment is hydrostatically tested, the water is first introduced and afterwards removed from the pipeline with a high sealing pig / scraper tool. After the removing of the water, the humidity level is reduced to the required dew point per the pipeline operator specification. This process may require a combination of pig/scraper foam pigs and hot-dry air or nitrogen.
7704 E 38th Street Tulsa, OK 74145
Phone: 918-627-0426
Toll Free: 800-224-2305
Fax: 918-627-3310